18
JUL
2019

Complete bathroom renovation! – July 2019

comment : Off
  • Large walk in showering space with the tray flat to the floor, we have built a recess for storage of soaps and other showering products.
  • Within the shower we have fitted a fixed drencher head and a slide rail kit, all controlled via the recessed shower valve.
  • The half height stud wall is used to hide all the pipework for the basin and W.C. This also offers a clean and modern feel to the room.
  • ┬áThe radiator has been fitted just before the shower, so the towels are all nice and warm ready for when you’re finished in the shower!
About the Author